Starbucks Pop-up

Yes. Thats the idea. To use it on special events

2 Likes

And that is why my latte’s cost an arm or a leg

At least someone I know is benefiting form it!

2 Likes

Dude! It is astounding how amazingly like your mockup the final product is! The only differences I can see between your mockup image and your final image is … the grass is brown in the real image! LOL

The design was provided by the brand to the project owner (the sign shop) they asked me just to fabricate the thing. They transported it and handled the in site assembly. I asked a couple of modification just to make serialized sheets in the cnc (only 3 gcodes formed everything)

3 Likes

1 Like

Trust me. In my country we can’t bill the same as you guys in usa. All that was less than 1500 usd for labor for 35 sheets of acm 8 plywood sheets and 4 mdf sheets, cnc hours, installation of the acm to the structures, desing of such structures, creating the installation plans.

But my costs are really low. Including me that work was made by 3 people

5 Likes

G66 117 121 32 109 97 116 101 114 105 97 108 46

G67 117 116 32 97 110 100 32 97 115 115 101 109 98 108 101 32 109 97 116 101 114 105 97 108 46

G80 114 111 102 105 116 33

Sometimes small changes can make things so much easier to handle. If you have only 3 types/sizes of sheets. No matter what you are going to speed up everything.

2 Likes

Very sorry to hear. I hope costs are low then as well.

Impressive work!!!

Oh yes, compared on how costs are here versus there. Yes. Rounding it up, as I didn’t have to sell the project, pay for materials, transportation (in,out) field install, i didn’t even used the vacuum bed (+18hs of cnc from a 2.4kw pump), only payed less than 200usd in over time for the employees.

5 Likes

Thanks. For you and everyone who liked it!

3 Likes