Back up and running. I just finished machining the counterbores for the threaded inserts in my lower elevator board.
I planned for a good amount of screw points outside of the machining area so I will have to drill those by hand. But I am planning on using the upper elevator board as a drill template so that should speed things up considerably. Then I’ll spend the next week or so installing the inserts.